STRUCTURES EPC CONTRACTIN PROGRESS

Major River Bridges & Structural Crossings Package

Sindh & Betwa River Basins, Madhya Pradesh
MPRDC / State PWD
CONTRACT VALUE
₹48 Cr
EXECUTION STATUS
IN PROGRESS
PROJECT CATEGORY
STRUCTURES
GOVERNING AUTHORITY
MPRDC / State PWD

PROJECT EXECUTIVE SUMMARY

Comprehensive structural package comprising 3 Major River Bridges with deep well and bored pile foundations, 18 Minor Bridges, 100+ RCC box culverts, and pre-stressed concrete (PSC) girder superstructures.

KEY EXECUTION DELIVERABLES

3 Major multi-span river bridges with 1200mm diameter bored cast-in-situ pile foundations
18 Minor bridges with reinforced concrete pier caps, elastomeric bearings, and deck slabs
Over 100 high-capacity reinforced concrete box culverts and vehicular underpasses (VUP)
Mechanically Stabilized Earth (MSE) / Reinforced Earth (RE) approach retaining wall systems

TECHNICAL SCOPE & METHODOLOGY

01.Deep hydraulic pile boring through hard rock strata and cross-hole ultrasonic testing (CSL)
02.High-performance M45 & M50 grade concrete mix with automated batching and temperature control
03.Post-tensioned Pre-stressed Concrete (PSC) girder casting in dedicated yard and crane launching
04.Installation of POT-PTFE bridge bearings and multi-cell elastomeric strip seal expansion joints

QUANTITATIVE METRICS

Major Bridges
3 Multi-Span Units
Minor Bridges
18 Structures
Piles Bored
164 Deep Piles
Box Culverts
100+ Units

EQUIPMENT & FLEET DEPLOYED

  • 2 Hydraulic Rotary Piling Rigs (Mait / Bauer 1200mm)
  • 1 Girder Launching Gantry (150 MT Capacity)
  • 2 Heavy Crawler Cranes (75 Ton Sany / Kobelco)
  • 6 Transit Mixers (6 m³)
  • 2 High-Pressure Concrete Pumps (Schwing Stetter)

ENGINEERING CODES OF PRACTICE

  • IRC:112-2020 (Code of Practice for Concrete Road Bridges)
  • IRC:78-2014 (Standard Specifications for Road Bridges - Foundations & Substructure)
  • IRC:83 (Bearings for Road Bridges - Pot, Elastomeric & Spherical)
  • MoRTH Specifications for Road and Bridge Works (Sections 1100, 1200, 1500, 1700, 2000)

VERIFIED ON-SITE SURVEY & EXECUTION

CONSTRUCTION GALLERY

3 Verified Field Photographs
Bridge & Culvert Raft Rebar Inspection - Major River Bridges & Structural Crossings Package
Isagarh Dhakoni Road | Lat 24.786°, Long 77.859°
Bridges & Structures
Bridge & Culvert Raft Rebar Inspection

Site engineers and quality supervisors verifying reinforcement spacing, cover blocks, and bar tying before concrete pour.

Structural Culvert Foundation Pit Engineering - Major River Bridges & Structural Crossings Package
Isagarh Dhakoni Road | Lat 24.786°, Long 77.859°
Bridges & Structures
Structural Culvert Foundation Pit Engineering

Excavated pit for major box culvert with dewatering setup and multi-layer high-tensile steel reinforcement.

Minor Bridge Substructure (MNB at CH 64+040) - Major River Bridges & Structural Crossings Package
MNB at CH 64+040 | Lat 24.727°, Long 78.172°
Bridges & Structures
Minor Bridge Substructure (MNB at CH 64+040)

Substructure casting, concrete ponding curing, and earth formation adjacent to active highway alignment.